Case study · Mining

Namakwa Sands

Independent check surveyors for Tronox: concrete works and conveyor installations verified for two contractors.

Place
Western Cape, South Africa
Client
Namakwa Sands (end client Tronox)
Contractors
WBHO, Grinaker LTA
Our role
Check surveyors and re-surveyors
A total station set up beside conveyor equipment at Namakwa Sands

Overview

Geovantage was appointed by Tronox as independent check surveyors on the Namakwa Sands site in the Western Cape. Our main job was to verify the accuracy of all concrete works and the installation of conveyor systems for the two main contractors, WBHO and Grinaker LTA.

Quick factIndependent check surveyors at Tronox's Namakwa Sands site, verifying concrete works and conveyor installations for accuracy, quality and contractor coordination.

Scope of work

  • Maintaining accurate as-built records for quality assurance
  • Coordination with multiple contractors to resolve discrepancies promptly
  • Alignment and installation checks for conveyor systems
  • Re-surveying and verification of structural concrete placement

Survey equipment used

  • Digital Levels: for precise elevation checks on concrete works
  • GNSS RTK System: for rapid, high-accuracy positioning across the site
  • Robotic Total Station: for precision alignment and measurement of conveyor structures

Outcome

All surveyed works met Tronox's quality specifications, which reduced rework and delays. Accuracy was held within millimetre tolerances, keeping the project on schedule and in line with the engineering requirements.